Skip to main content

CONTROL OF VARIABILITY FOR MAN MEASUREMENT

Anne-Sophie Guerra, Maurice Pillet, Jean-Luc Maire

Abstract

In a visual control, the measurement system is human. Each appraiser must control the part and judge the conformity. Consequently, the subjectivity of measure is very present and the variability therefore high.
The subjectivity of this inspection is generated by two aspects: the exploration i.e. the capacity to perceive the defect by the appraiser and the evaluation i.e. the capacity to evaluate correctly the defect. So, after to realize the exploration and after to have made the evaluation, the appraiser could with more of facilities to give a reponse and so a judgement on the acceptability of the defect. The inspection must be separated into two operations: the exploration and the evaluation.

Keywords
variability, measure, subjective evaluation
Download
IMEKO-TC1-TC7-2008-004.pdf
DOI
-
IMEKO TC
TC1 - Education and Training in Measurement and Instrumentation

Event details

Event
TC1 & TC7 Conference 2008
Technical Committee
TC7
Email
imeko2008@scientific-symposium.com
Place
Annecy, FRANCE
Time
3 September 2008 - 5 September 2008
Website
http://imeko2008.scientific-symposium.com

Back to the proceedings