Skip to main content

WORKLOAD MEASUREMENTS AND SYNCHRONISATION INTO A DISTRIBUTED MEASUREMENT LABORATORY

Andrea Condarcuri, Domenico Grimaldi, Antonino Panella

Abstract

The Distributed Measurement Laboratory (DML) is an heterogeneous system and the workload evaluation is an important aspect to support the performance management strategies in the case the specific requirements must to be respected. The paper describes the method to evaluate the workload of the cooperating hardware equipments of the DML, in particular: (i) the connecting networks, and (ii) the PCs. In this manner useful indexes are achievable to monitor the functioning conditions of the whole DML. The proposed method is based on three different tools known and tested in literature. The first one concerns with the synchronization among the clocks of the different co-operating PCs. The second one concerns the One-Way Delay parameter measurements of the path from the source to the destination. The third one concerns the workload measurement of the CPU of each PC. The results of several experimental tests showing the performance and the accuracy of the method are shown.

Keywords
delay measurement, synchronisation, CPU occupancy, distributed measurement
Download
IMEKO-TC4-2004-063.pdf
DOI
-
IMEKO TC
TC4 - Measurement of Electrical Quantities

Event details

Event
TC4 Symposium 2004
Technical Committee
TC4
Email
imeko@mail.ntua.gr
Place
Athens, GREECE
Download
imeko_tc4_2004_call_for_papers2.pdf
Time
29 September 2004 - 1 October 2004
Website
http://www.medialab.ntua.gr/IMEKO

Back to the proceedings