Skip to main content

A NEW ULTRASTABLE TRANSFER STANDARD FOR TCC’S NEW HIGH PRESSURE GAS METER CALIBRATION FACILITY

H. H. Dijstelbergen, H. Bellinga

Abstract

Tests are reported on a 10-unit Rotary Piston Prover system that is installed at the TCC high-pressure gas meter testing facility. The paper also describes new tests that were carried out with the Rotary Piston Prover concerning its temperature dependence. Tests against a Bell Prover are also reported.

Keywords
reference standards, gas meter calibration, meter proving, piston prover, high pressure gas meter testing
Download
IMEKO-TC9-2000-077.pdf
DOI
-
IMEKO TC
TC9 - Flow Measurement

Event details

Event
FLOMEKO 2000
Technical Committee
TC9
Place
Salvador, Bahia, BRAZIL
Time
4 June 2000 - 8 June 2000

Back to the proceedings