Skip to main content

INVESTIGATION OF TRANSFER STANDARDS IN THE HIGHEST RANGE UP TO 50 MN WITHIN EMRP PROJECT SIB 63

Falk Tegtmeier, Michael Wagner, Rolf Kumme

Abstract

The EMRP SIB 63 project was established to give the end user the needed measurement technology, traceability and tools to work in the highest force range up to 50 MN. This paper describes work package WP1 which deals with BU systems as transfer standards. A knowledgebase was collected to optimize the design with complex studies and models. Within the project, also an uncertainty model and technical guidelines will be developed.

Keywords
transfer standard, meganewton, build-up system
Download
IMEKO-WC-2015-TC3-083.pdf
DOI
-
IMEKO TC
TC3 - Measurement of Force, Mass, Torque, and Gravity

Event details

Event
XXI IMEKO World Congress
Place
Prague, CZECH REPUBLIC
Time
30 August 2015 - 4 September 2015
Website
http://imeko2015.org/

Back to the proceedings