Skip to main content

DEVELOPMENT OF A 15MN BUILD-UP-SYSTEM FOR CALIBRATIONS IN UKRAINES HEAVY INDUSTRY

Michael Wagner, Alexander Tsiporenko, Falk Tegtmeier

Abstract

This paper describes the constructional details of an FEM-supported construction of adaptation parts for a Build Up system up to 15 MN. After a short introduction about “Ukrmetrteststandard”, the NMI in Ukraine, several constructional details will be discussed which result in a very low measurement uncertainty. In addition, some experiences about the use of BU systems obtained during the evaluation will be presented.

Keywords
Ukrmetrteststandard, build-up system, mega-netwon range
Download
IMEKO-WC-2015-TC3-090.pdf
DOI
-
IMEKO TC
TC3 - Measurement of Force, Mass, Torque, and Gravity

Event details

Event
XXI IMEKO World Congress
Place
Prague, CZECH REPUBLIC
Time
30 August 2015 - 4 September 2015
Website
http://imeko2015.org/

Back to the proceedings