THE SYNCHRONIZATION OF PROCESSES IN REGISTRATION TRACK OF DATA FROM ELECTRICAL POWER SYSTEM
Abstract
In paper, the synchronization of operations performed in registration track of the parameters from electrical power system is discussed. The synchronization operations are carried out in the track during communication between functional blocks, on several levels of these operations (bit, frame and information synchronization). The successive stages of data registration track in instrument are shown. The different ways of frame synchronization in transmission between selected blocks and some obtained effects are presented.
Event details
- Event
- XXI IMEKO World Congress
- Place
- Prague, CZECH REPUBLIC
- Time
- 30 August 2015 - 4 September 2015
- Website
- http://imeko2015.org/