Skip to main content

Virtual DMT: An Opportunity for Pile Design?

Gianni Togliani

Abstract

The DMT results are rarely used for piles design, probably because its diffusion and popularity are still limited although DMT is in use for a long time. Conversely CPTu are much more popular and often used to this purpose: this is the reason why a large concerned database is available where it is possible to get the CPTu/DMT conversion experienced in recent years. This was done for two well-documented cases [a bored pile in Santa Cruz (Bolivia) and a driven pipe pile in Sandpoint, (US)] with promising results.

Keywords
DMT, Pile, Capacity, Load, Movements
Download
IMEKO-TC4-GEO-2016-22.pdf
DOI
-
IMEKO TC
TC4 - Measurement of Electrical Quantities

Event details

Event
TC4 International Workshop on Metrology for Geotechnics 2016
Technical Committee
TC4
Email
daponte@unisannio.it
Place
Benevento, ITALY
Time
17 March 2016 - 18 March 2016

Back to the proceedings