Skip to main content

Measurement Uncertainties Estimation Introduced by the Diverter Into the Budget of Standard Uncertainties

R. A. Korneev, A. R. Tukhvatullin, V. A. Fafurin, A. V. Shchelchkov, A. I. Ataeva

Abstract

An indirect method is presented for estimation standard measurement uncertainties included into a standard uncertainty budget by the diverter, reproducing units of mass and volume of fluid in a stream, mass and volumetric flow rates of a fluid.

Download
IMEKO-TC9-2019-089.pdf
DOI
-
IMEKO TC
TC9 - Flow Measurement

Event details

Event
FLOMEKO 2019
Technical Committee
TC9
Email
flomeko2019@lnec.pt
Place
Lisbon, PORTUGAL
Time
26 June 2019 - 28 June 2019
Website
http://flomeko2019.lnec.pt

Back to the proceedings