Skip to main content

An integrated approach to the study of the architectural features of the theatre of Tyndaris

Marco Sfacteria, Stefania Tuccinardi, Marta Venuti

Abstract

The ancient theatre of Tindari, located in the southeastern sector of the ancient city, is adapted to a particularly narrow and steep hillside morphology, which necessitated hybrid construction solutions. This study aims to clarify the construction techniques, structural adaptations, and subsequent transformations of the koilon, addressing the gap in understanding the functional and structural role of the theatre’s earth-retaining and annular corridor. To achieve this, archaeometric analyses of mortars are combined with geomorphological assessment. The cavea, partially carved into the natural rock, is completed by artificial earth fill supported by massive analemma walls, particularly at the outermost sections. The discontinuity of the bedrock and the transverse structural thrusts have caused deterioration phenomena and localized collapses since antiquity. The study demonstrates that the annular corridor and podium, previously interpreted primarily in functional terms, played a decisive structural role. These findings provide a basis for informed conservation strategies and highlight the original contribution of this research in reevaluating the theatre’s construction logic and structural behavior.

Download
IMEKO-Metroarchaeo-2025-023.pdf
DOI
10.21014/tc26-2025.023
IMEKO TC
TC26 - Metrology for Cultural Heritage

Event details

Event
TC26 MetroArcheo Conference 2025
Technical Committee
TC26
Email
info@metroarcheo.com
Place
Bergamo, ITALY
Time
15 October 2025 - 17 October 2025
Website
https://www.metroarcheo.com/

Back to the proceedings