A NEW ULTRASTABLE TRANSFER STANDARD FOR TCC’S NEW HIGH PRESSURE GAS METER CALIBRATION FACILITY

H. H. Dijstelbergen, H. Bellinga
Abstract:
Tests are reported on a 10-unit Rotary Piston Prover system that is installed at the TCC high-pressure gas meter testing facility. The paper also describes new tests that were carried out with the Rotary Piston Prover concerning its temperature dependence. Tests against a Bell Prover are also reported.
Keywords:
reference standards, gas meter calibration, meter proving, piston prover, high pressure gas meter testing
Download:
IMEKO-TC9-2000-077.pdf
DOI:
-
Event details
IMEKO TC:
TC9
Event name:
FLOMEKO 2000
Title:
10th Conference on Flow Measurement
Place:
Salvador, Bahia, BRAZIL
Time:
04 June 2000 - 08 June 2000