INVESTIGATION OF TRANSFER STANDARDS IN THE HIGHEST RANGE UP TO 50 MN WITHIN EMRP PROJECT SIB 63

Falk Tegtmeier, Michael Wagner, Rolf Kumme
Abstract:
The EMRP SIB 63 project was established to give the end user the needed measurement technology, traceability and tools to work in the highest force range up to 50 MN. This paper describes work package WP1 which deals with BU systems as transfer standards. A knowledgebase was collected to optimize the design with complex studies and models. Within the project, also an uncertainty model and technical guidelines will be developed.
Keywords:
transfer standard, meganewton, build-up system
Download:
IMEKO-WC-2015-TC3-083.pdf
DOI:
-
Event details
Event name:
XXI IMEKO World Congress
Title:

Measurement in Research and Industry

Place:
Prague, CZECH REPUBLIC
Time:
30 August 2015 - 04 September 2015