Virtual DMT: An Opportunity for Pile Design?

Gianni Togliani
Abstract:
The DMT results are rarely used for piles design, probably because its diffusion and popularity are still limited although DMT is in use for a long time. Conversely CPTu are much more popular and often used to this purpose: this is the reason why a large concerned database is available where it is possible to get the CPTu/DMT conversion experienced in recent years. This was done for two well-documented cases [a bored pile in Santa Cruz (Bolivia) and a driven pipe pile in Sandpoint, (US)] with promising results.
Keywords:
DMT, Pile, Capacity, Load, Movements
Download:
IMEKO-TC4-GEO-2016-22.pdf
DOI:
-
Event details
IMEKO TC:
TC4
Event name:
TC4 International Workshop on Metrology for Geotechnics 2016
Title:

1st IMEKO TC4 International Workshop on Metrology for Geotechnics

Place:
Benevento, ITALY
Time:
17 March 2016 - 18 March 2016